Badger, W W and Mulligan, D E (1995) An implementation model of an alliance. Journal of Construction Procurement, 1(01), 21–37.

Davenport, D M and Smith, R (1995) International procurement systems: assessment of required levels of client participation in construction projects. Journal of Construction Procurement, 1(01), 38–49.

Naoum, S G and Mustapha, F H (1995) Relationship between the building team, procurement methods and project performance. Journal of Construction Procurement, 1(01), 50–63.

  • Type: Journal Article
  • Keywords: building team; procurement; performance; project management
  • ISBN/ISSN: 1358-9180
  • URL: http://www.journalofconstructionprocurement.com/abstractdetails.asp?id=4
  • Abstract:
    This paper presents some findings of a research project on investigating the influence of the building team on project performance. The paper has several assumptions which form the basis for the discussion of the research framework. Foremost, is the assumption that, the procurement method selected for the project effects project performance but not by itself is the only determinate. Characteristics of the building team i.e. the client, designer and the contractor can significantly influence the outcome of the project. Data from 69 case studies were collected to validate this assumption and it was found that, experience of the building team with the building process has significantly influenced the time and cost overruns, as well as the quality standard of the project. On the other hand, pre-construction time and unit cost were more associated with whether the client had selected a management or a traditional form of contract. With regard to speed of construction, this research did not provide enough evidence to conclude that alternative procurement methods can directly shorten the construction time. Construction time was more influenced by the building type and the method of construction.

Songer, A D and Ibbs, W C (1995) Managing requests for proposal development in public sector design-build. Journal of Construction Procurement, 1(01), 64–80.

Walker, D H T (1995) The influence of client and project team relationships upon construction time performance. Journal of Construction Procurement, 1(01), 4–20.